Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4. INSTRUCTIONS

Foot Pad, Front and Rear Stabilizers Installation:
Position two Foot Pad(52) onto the Front Stabilizer (13).
Position four Foot Pad(52) onto the Rear Stabilizer (8).
Remove two M8x15 Bolts (28), two Ø8x Ø20 Washers (31) from Front Stabilizer (13) . Position the
Front Stabilizer (13) in front of the Main Frame (1) and align bolt holes.
Attach the Front Stabilizer (13) onto the front curve of the Main Frame (1) with two M8x15
Bolts (28), two Ø8x Ø20 Washers (31) that were removed.
Position the Rear Stabilizer (8) behind the Main Frame (1) and align bolt holes.
Attach the Rear Stabilizer (8) onto the rear curve of the Main Frame (1) with two Bolt M8x75 (48),
two Ø8x Ø20 Curve Washers (49) ,two spring washer Ø8 (18),two Cap Nut M8 (68).
41

Publicité

Table des Matières
loading

Table des Matières