Chapter 5
3
5
7
4a
2
9
wed side of the dwelling, preferably from the wall or an over-
hang. If the outdoor air is sucked in from under the tiles, it
must be ensured that no condensation develops in the roof
boarding and no water can run in. Ventilation air can be suc-
ked in from under the tiles if air can access freely at the top
and the bottom of the roof area and the sewage vent stack
does not end under the tiles.
A = Spacing 10 mm above roof deck
B = Roof insulation
C = Seal with foam
D = Pipe for make-up air to be carefully insulated and provi-
ded with vapour barrier
manner that no condensation develops in the roof boarding.
and the roof sleeve in such a manner that surface conden-
sation is prevented.
12
4b
6
9
10
A
1
A = Minimum height > 60 mm
-
Renovent Excellent 180
1 = Renovent Excellent 180 left-
2 = Preferred ventilation air supply
3 = Ventilation air supply under the
4a = Free suction bottom roof area
4b = Free suction top roof area
5 = Sewage system vent stack
6 = Preferred location exhaust ven-
8
= Brink synthetic high ef ciency
8 = Condensate discharge
9 = Acoustic hose
10 = Ducts from and to dwelling
is 150 Pa at the maximum ventilation capacity. If the resi-
stance of the duct system is higher, the maximum ventilation
capacity will be lower.
sewer stack vent relative to the input must be chosen to pre-
vent nuisance.
and draught. We recommend to use the Brink supply dif-
fusers.
1 = Brink supply diffusers
2 = Supply from wall
3 = Exhaust valve in ceiling or high in wall
4 = Prevent crosstalk
5 = Preferably Brink incorporated ducts
a = Gap under the door 2 cm.
Installation
handed 4/0 (install level)
tiles
tilation air; use Brink insulated
ventilation roof sleeve.
HRV duct