Initial Switch−On - Lenze CANopen EMF2178IB Instructions De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Initial switch−on
)
Note!
Follow the commissioning steps in the given order!
1. Switch on the standard device and, if necessary, the external voltage supply of the
communication module.
– The green LED 0 on the front of the communication module is lit.
– The status LED of the standard device (Drive LED) 2 must be lit or blinking. The
meaning of the signalling can be found in the standard device documentation.
2. You can now communicate with the drive, i. e.
– all parameters (SDO) can be read;
– all writable parameters (SDO) can be overwritten.
3. After a state change ("Operational") process data can be exchanged with the drive.
Fig. 7
LEDs of the communication module
EDKMF2178IB DE/EN/FR 6.1
l
Commissioning
Initial switch−on
2172CAN000D
7
71

Publicité

Table des Matières
loading

Table des Matières