)
Note!
Adhere to the switch−on sequence.
l
In case of faults during commissioning, the chapter on "Troubleshooting"
l
provides support (^ 128).
Switch−on sequence
1.
Ensure that the starttec is inhibited
after mains switch−on
2.
Switch on mains
3.
Switch on 24−VDC supply
4.
Release starttec
5.
Release brake, if necessary
6.
Start the drive
7.
The drive is now running
L
Terminal X3/28 = LOW
Terminal X3/28 = HIGH
Terminal X3/E3 = HIGH
Start motor 1 Terminal X3/E1 = HIGH
CINH
E1
M
E3
EDK71MMXXX−010 DE/EN/FR 5.0
Commissioning
Without hand terminal
t
t ir
t if
start013
7
Comment
CINH
Release starttec via
X3/28
E1
Start motor
M1
Voltage characteristic at
X1/1U, 1V, 1W (motor 1)
E3
Brake control at X1/B1,
B2
t
Acceleration time
ir
t
Deceleration time 0.5 s
if
(C0013)
99