5.2 – UNPACKING
Check that the packing has not been damaged during transport.
Check that the packing has not been damaged during transport.
5.2.1 – MEANS REQUIRED
Use a fork-lift truck or equivalent equipment to lift the appliance.
equivalent equipment to lift the appliance.
The use of unsuitable equipment can cause accidents to those involved in the operation and/or damage to
The use of unsuitable equipment can cause accidents to those involved in the operation and/or damage to
The use of unsuitable equipment can cause accidents to those involved in the operation and/or damage to
the appliance.
The manufacturer declines all responsibility for improper non
The manufacturer declines all responsibility for improper non-compliant use of equipment
transport and handling.
5.2.2 – UNPACKING PROCEDURE
All the handling and unpacking operations must be carried out with extreme care, making sure that all
All the handling and unpacking operations must be carried out with extreme care, making sure that all
All the handling and unpacking operations must be carried out with extreme care, making sure that all
personnel is strictly at a safety distance and that no
personnel is strictly at a safety distance and that no-one stands under suspended
motion.
To unpack the appliance just remove its cardboard wrapping. Take the appliance off the pallet, lifting it by means of a suitable fork-lift
To unpack the appliance just remove its cardboard wrapping. Take the appliance off the pallet, lifting it by means of a sui
To unpack the appliance just remove its cardboard wrapping. Take the appliance off the pallet, lifting it by means of a sui
truck; the forks should be placed under the appliance
truck; the forks should be placed under the appliance taking care not to damage the two water tray runners.
AFTER INSTALLING THE APPLIANCE, WAIT AT LEAST TWO HOURS BEFORE TURNING IT ON.
AFTER INSTALLING THE APPLIANCE, WAIT AT LEAST TWO HOURS BEFORE TURNING IT ON.
AFTER INSTALLING THE APPLIANCE, WAIT AT LEAST TWO HOURS BEFORE TURNING IT ON.
5.3 – HANDLING THE BLAST CHILLER
5.3.1 – MEANS REQUIRED
See paragraph 5.2.1.
The use of unsuitable equipment can cause accidents to those
The use of unsuitable equipment can cause accidents to those involved in the operation and/or damage to
the appliance.
The manufacturer declines all responsibility for improper non-compliant use of equipment for lifting,
The manufacturer declines all responsibility for improper non
transport and handling.
5.3.2 – HANDLING THE UNPACKED BLAST CHILLER
HANDLING THE UNPACKED BLAST CHILLER
All the handling and unpacking operations must be carried out with extreme care, making sure that all
personnel is strictly at a safety distance and that no-one stands under suspended loads, be they still or in
personnel is strictly at a safety distance and that no
motion.
To move blast chillers on wheels, release the brakes on the wheels and push, taking care to block the brakes again when the appliance
To move blast chillers on wheels, release the brakes
is in its permanent position.
To move blast chillers on feet, lift them with a suitable fork-lift truck; the forks should be placed under the appliance,
To move blast chillers on feet, lift them with a suitable fork
damage the two water tray runners.
5.4 – BLAST CHILLER ASSEMBLY
The blast chiller is delivered to the customer assembled in all its parts.
The blast chiller is delivered to the customer assembled in all its parts.
Remove the water tray from the chamber and place it in position along the runners placed under the appliance between
Remove the water tray from the chamber and place it in position along the runners placed under the appliance between the feet.
Remove the water tray from the chamber and place it in position along the runners placed under the appliance between
BCB_03-05-10-15 Rev.02
unpacking operations must be carried out with extreme care, making sure that all
unpacking operations must be carried out with extreme care, making sure that all
on the wheels and push, taking care to block the brakes again when the appliance
lift truck; the forks should be placed under the appliance, taking care not to
compliant use of equipment for lifting,
one stands under suspended loads, be they still or in
e the two water tray runners.
involved in the operation and/or damage to
compliant use of equipment for lifting,
one stands under suspended loads, be they still or in
pag. 57

Publicité

Table des Matières
loading

Produits Connexes pour Gemm NEW RUNNER Série

Table des Matières