Appendix 2: Installing The Optional Door Overlay - SBI Escape 2100 Mode D'emploi

Masquer les pouces Voir aussi pour Escape 2100:
Table des Matières

Publicité

Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/26/2019 7:45:42 AM
1 - INSTALLATION MANUAL SOLUTION 3.5 ENGLISH

Appendix 2: Installing the Optional Door Overlay

In order to complete the assembly of your Solution 3.5 wood stove, you need to install the door
overlay. See figure below for installation instructions:
Solution 3.5 Installation and Operation Manual
Stove Builder International Inc. | 44826 | Rev: May 31 2019 2:49PM | Uncontrolled Copy
Position the overlay (A) on the door
frame and secure it from the inside of
the door using the 4 included screws
(B).
To facilitate the installation, do not
tighten the screws until they are all
installed.
Note: It is not necessary to remove the
glass or any other component to install
the overlay
(45 OF 57)
45
Page 127 of 425

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour SBI Escape 2100

Table des Matières