SBI Escape 2100 Mode D'emploi page 128

Masquer les pouces Voir aussi pour Escape 2100:
Table des Matières

Publicité

Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/26/2019 7:45:42 AM
1 - INSTALLATION MANUAL SOLUTION 3.5 ENGLISH
Leg kit installation:
Solution 3.5 Installation and Operation Manual
Stove Builder International Inc. | 44826 | Rev: May 31 2019 2:49PM | Uncontrolled Copy
4- Secure each leg (A) on support (B) using
(2) washers (C) and (2) nuts (D) supplied
in the kit. Repeat the same mounting
procedure for the second support.
5- Secure both leg support assembly to the
underside of the firebox using the bolts,
washers and nuts removed in step 3.
Supports can be installed on either side.
Note: Insert each bolt from the inside of the
firebox, this will allow the bricks to sit more
evenly on the floor of the firebox.
6- Gently flip the stove back on its legs
making sure not to put too much weight on
the rear legs.
7- Open the ash drawer lid then slide it on the
left and right bend of the legs support
brackets.
8- Position the stove for its installation and
reinstall the door and the bricks (see
Appendix 9: Exploded Diagram and
Parts List for layout).
Note: Make sure that baffle components have
not moved during the leg installation process
since a flue blockage may occur.
(43 OF 57)
43
Page 125 of 425

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour SBI Escape 2100

Table des Matières