Dometic COOLAIR SP950I Instructions De Montage page 20

Masquer les pouces Voir aussi pour COOLAIR SP950I:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 50
Installation
I
NOTE
• Before drilling, check the position of the drill template and the marked
holes.
• If the space between the interior trim and the cab's rear panel is large, the
hole (Ø 15 mm) for the inclined condensation line must be drilled slightly
lower than specified on the template. For a distance for the interior trim to
the cab's rear panel of approx. 25 mm the hole (Ø 15 mm) should be drilled
approx. 5 mm lower to ensure that the condensation drainage process
functions.
➤ Drill at the marked positions using appropriate drill bits.
A
NOTICE!
Make sure that the coupling half with the thin, capillary tube is not twisted or
kinked.
➤ Carefully unwind the connection line.
➤ To fit the evaporator unit in place, route the connection line through the hole
with Ø 48 mm and the condensation line through the hole with Ø 15 mm.
➤ Fit edge protection to the holes with a diameter of Ø 48 mm.
➤ Position the cable grommet for the PVC hose so that this is protected against
any sharp edges on the hole.
➤ If spacer sleeves are used, drill large holes in the interior trim to accommo-
date them.
➤ Insert the matching screws and washers using sealant from the outside.
➤ Tighten the evaporator unit from the outside using the lock nuts M6 and
washers M6 (fig. 7, page 5).
➤ Connect the connection cable of the control panel to the connecting plug in
the housing.
➤ Use the previously removed hex screws to fasten the housing of the
evaporator unit.
20
CoolAir SP950I
EN

Publicité

Table des Matières
loading

Table des Matières