Installation
• You can connect the unit to the battery via the lorry's terminal block or
directly. The terminal block is to be preferred for the connection. On some
vehicles, larger consumers connected to the terminal block are switched off
after a short while if the power requirement is too high. Ask your vehicle
manufacturer for the specifications of the terminal block.
• Observe the body manufacturer's guidelines with regard to installation of the
unit and its electrical connection.
• Pay attention to the connection plan for the device:
No. in
fig. c, page 9
6.3

Determining the installation position

The system's installation position must meet the following criteria:
• All maintenance work must be easy to perform.
• Sufficient space must be available for the refrigerant line.
• The condenser unit must be installed in an upright position.
Observe the maximum permissible inclination angle at the side and to the
front when in operation (fig. 3, page 3).
• The refrigerant line must be long enough (approx. 2.1m) for connection of
the condenser and evaporator unit. The line must not be routed under
tension (fig. 4, page 4).
• The fastening surface should be as flat as possible. Use spacer sleeves for
uneven surfaces. If spacer sleeves are used, appropriately longer fastening
screws with sufficient tensile strength (not included in the assembly set) must
then be used.
18
Designation
1
Evaporator fan
2
Operating circuit board
3
Temperature sensor
4
Control unit
5
25 A fuse
6
4 A fuse vaporiser fan
7
4 A fuse condenser fan
8
Condenser fan
9
Compressor
10
Klickson (compressor)
CoolAir SP950I
EN