8.1 Mounting procedure

Below, we use a weighbridge as an example for the mechanical installa-
tion. We recommend that you proceed as follows:
D Use appropriate lifting gear to lift one face of the weighbridge that has al-
ready been centered.
D Prepare the load introduction parts and mount the part with the rotation
stop dowel pin below and the load introduction part without the dowel pin
above. The lower load introduction part must be aligned such that the
dowel pin points in the direction in which, later on, the cable outlet and the
type plate are to be point, although do not yet finally fix it.
Position of rotation stop dowel pin:
ATTENTION
Radially position open side!
D Use a sufficient amount of the grease provided with the load cells to protect
from wear, tear, dirt and corrosion the upper and lower load introduction
parts in the load carrying element, the dowel pin and the rotation stop on
the load cell.
ATTENTION
Grease load introduction
parts and dowel pin:
D Fix the lower load introduction parts with a spanning washer when using
EPO3/50t or eccentric washers when using C16/EPU44A or C16/ZOU44A.
For subsequent sealing of the flexible tube, mount the tube clip supplied
with the load cell around the lower compression pad.
D Now insert the load cells by rotating them into the lower load introduction
part such that the dowel pin engages into the rotation stop recess.