Fortress Building Products PURE VIEW Instructions D'installation page 37

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 1
2X
STAIR BRACKET: BALUSTER INSTALLATION
Step
1: Install Bottom Rail
1. Install cut bottom rail into the lower installed brackets.
As shown in Fig. 1.
2. Pre-drill Bracket Cup holes for screws using a 3/16"
[89.5mm] drill bit.
3. Secure rail to Bracket Cups with provided T-25 Drive
Thread-Cutting Screws. Use low speed setting on drill.
As shown in Fig. 2.
Note:
• Only one screw is needed to attached each bracket to the
rail.
Fig. 1
Step
2: Install Balusters Into Bottom Rail
1. Carefully slip Balusters vertically into each slot of the
bottom rail. Holes in balusters should not be visible after
insertion of baluster into rail. As shown in Fig. 1.
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
Fig. 2
37

Publicité

Table des Matières
loading

Table des Matières