Fortress Building Products PURE VIEW Instructions D'installation page 32

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 5
Step 3:
Top Bracket Installation (UB or CB)
1. Position wood 2" x 4" [60mm x 101.5mm] on stairs in line
with bottom brackets.
2. Place bottom rail on top of wood 2" x 4" [60mm x
101.5mm] next to bottom brackets. As shown in Fig. 1.
3. Have bottom rail positioned as close to final installation
position as possible.
4. Add two balusters to the bottom rail, add top rail, then
clamp panel to post. As shown in Fig. 2.
5. Position UB or CB bracket parallel
with top rail & flat centered on post.
Make sure inside bottom of bracket is flush with bottom
of rail. As shown in Fig. 3.
6. Use pencil to mark top edge of bracket location on post.
7. Dis-assemble the UB or CB bracket by removing the barrel
and screw. As shown in Fig. 4 & 5.
8. Place UB or CB Bracket Base on previous top edge mark.
Center the base on the post and use pencil to add marks for
two screw hole locations. As shown in Fig. 6.
Note:
• For best results, be sure bracket bases are centered on
posts when making marks.
32
CB-05 Stair
Bracket
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
Fig. 6

Publicité

Table des Matières
loading

Table des Matières