Fortress Building Products PURE VIEW Instructions D'installation page 22

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ANGLE BRACKET: BRACKET INSTALLATION (UB or CB)
Note:
THE BRACKET INSTALLATION INSTRUCTIONS COVER BOTH UB & CB,
ONLY USE STEPS SPECIFIC TO BRACKET BEING INSTALLED.
Step 1:
Mark Bracket Hole Locations (UB or CB)
1. Mark the centerline of each post with a pencil.
2. Take measurements used to mark bottom and top bracket
hole locations onto posts. Reference Fig. 1 and 2 for UB and
Fig. 3 and 4 for CB.
Note:
• Installed panel heights include space between the deck
surface and underside of bottom rail. Fe
3-3/4" [95.5mm] spacing.
Fig. 1
Pre-drill Dimensions: Pre-drilling with a 3/16"[4.5mm] drill bit is required
34" [864mm] Panel
4 3/8" [112mm]
40" [1016mm] Panel
4 3/8" [112mm]
*Dimension A positions bottom edge of rail 3-3/4" [95.5mm] above deck surface.
*Dimension A is measured from the bottom surface of post base.
Fig. 2
UB-05 Angle
Adapter
22
UB-05 Angle Adapter Bracket Hole Locations
A*
B
PURE VIEW: Fe
26
B
37-1/2" [953mm]
43-1/4" 1099mm]
A
C
GLASS BALUSTER INSTALLATION
has a spacing of
26
C
1" 3/16"[30mm]
1" 3/16"[30mm]
A

Publicité

Table des Matières
loading

Table des Matières