Fortress Building Products PURE VIEW Instructions D'installation page 21

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Collar Bracket (CB) Angled
Ball Cap
CB-05
3-3/4"
[95.5mm]
Base Cover
Pure View
Baluster Height
34" [864mm]
40" [1016mm]
*Installed heights include a 3-3/4" [95.5mm] space between deck surface
and bottom edge of bottom rail.
POST MOUNTING
• Reference Post Mounting instructions on page 5.
Note:
IT'S RECOMMENDED TO INSTALL BRACKETS ON TO POST BEFORE
POST MOUNTING.
Glass Baluster
Pure View: Steel Rail
69-1/2"[1765.5mm]
Collar Bracket (CB) Post Configuration
Installed Panel Height*
38-1/16" [967mm]
43-7/8" [1114mm]
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
Pressed Dome Cap
Pure View
3-3/4" [95.5mm] I-Support
2" X 2" & 3" X 3"
[51mm x 51mm] &
[76mm x 76mm]
Iron Posts with base
Rail Panel
Required Post
39-1/2" [1003mm]
45-1/2" [1156mm]
21

Publicité

Table des Matières
loading

Table des Matières