Fortress Building Products PURE VIEW Instructions D'installation page 19

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step
3: Install Balusters Into Bottom Rail
• Reference Baluster installation instructions on page13.
Step 4:
Install Top Rail
1. Slide CB-05 Brackets over each end of the Top Rail. Make
sure that all set screw holes face the desired direction.
As shown in Fig. 1.
2. Carefully slip Top Rail over the top of the Balusters into the
slots.
3. Secure Brackets into pre-drilled Bracket holes on post with
provided T-25 Drive Thread-Cutting Screws.
4. Pre-drill Bracket Set Screw holes on bottom Rail using a
3/16" [89.5mm] drill bit.
5. Secure Bracket to Rail with provided T-25 Drive
Thread-Cutting Screws. Use low speed setting on drill.
Fig. 1
Top Rail
Step 5:
Attach I-Support To Deck
• Reference I-support mounting instructions on page 14.
POST BASE COVER & PRESSED DOME/BALL CAP INSTALLATION
Step 1:
Post Base Cover & Pressed Dome/Ball Cap
• Reference Post Base Cover & Pressed Dome/Ball Cap
instructions on pages 14 & 15.
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
19

Publicité

Table des Matières
loading

Table des Matières