Fortress Building Products PURE VIEW Instructions D'installation page 25

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 4:
Install CB-05 Angled Brackets
1. Attach Angle Bracket Base piece to the posts with supplied
T-25 thread-cutting screws. Use low speed setting on drill.
As shown in Fig. 1.
2. Assemble Angle Bracket Body piece & Base piece.
As shown in Fig. 2.
Tip:
• Use a Bit Extender for an easier drilling process.
Fig. 1
Step 5:
Determine Panel Length
1. Check to ensure that all posts are square and straight. Shim
posts as required.
2. Ensure that the Angle Bracket Cups are approximately
aligned.
3. With another person's help, measure the distance from the
inside back of one cup to the inside back of the other cup.
This will be the panel length. As shown in Fig. 2.
Fig. 1
Fig. 2
UB-05 Angle Bracket
CB-05 Angled Bracket
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
25

Publicité

Table des Matières
loading

Table des Matières