Fortress Building Products PURE VIEW Instructions D'installation page 11

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 1
Step 3:
Apply Spray Paint To Cut Areas
1. Using a piece of cardboard as a mask, apply the 1
Fortress zinc based touch-up paint.
2. Allow to dry before applying second coat.
3. Apply the 2
4. Allow to dry and install.
Fig. 1
2X
UNIVERSAL BRACKET: BALUSTER INSTALLATION
Step 1:
Install I-Support On Bottom Rail
1. Measure and locate the center of the bottom rail. Using the
I-Support as a guide, mark the center of the 2 screw holes.
As shown in Fig. 1.
2. Using a 3/16" [4.5mm] drill bit, drill though the outside wall.
3. Install the I-Support with the provided T-25 thread cutting
screws. As shown in Fig. 2.
Note:
• Be sure to install I-Support on side of rail facing deck.
Fig. 2
coat of Fortress zinc based touch-up paint.
nd
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
Fig. 3
coat of
st
11

Publicité

Table des Matières
loading

Table des Matières