Fortress Building Products PURE VIEW Instructions D'installation page 30

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STAIR BRACKET: BRACKET INSTALLATION
Step 1:
Bottom Bracket Installation (UB or CB)
1. Position wood 2" x 4" [60mm x 101.5mm] between posts.
As shown in Fig. 1.
2. Position bottom UB or CB bracket centered flat on post &
wood 2" x 4" [60mm x 101.5mm]. Use pencil to mark top
edge of bracket location on post. As shown in Fig. 2.
3. Place UB or CB bracket base on previous top edge mark.
Center the base on the post and use pencil to add marks for
two screw hole locations. As shown in Fig. 3 & 4.
4. Dis-assemble the bracket by removing
the barrel and screw.
Note:
• For best results, be sure bracket base is centered on post
when making marks.
Fig. 1
Fig. 3
UB-05 Stair
Bracket
30
Fig. 4
CB-05 Angled
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
Fig. 2
Bracket

Publicité

Table des Matières
loading

Table des Matières