Fortress Building Products PURE VIEW Instructions D'installation page 14

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 5:
Attach I-Support To Deck
1. Fasten I-Support to deck surface with the supplied T-25
Wood Screw.
Tip:
• Pre-drill with a 1/16" [1.5mm] drill bit.
Fig. 1
BRACKET CAP, POST BASE COVER & PRESSED DOME/BALL CAP
Step 1:
Install Bracket Cap, Post Base Cover & Pressed Dome Cap
1. Bracket Caps snap down over Bracket Cups.
As shown in Fig. 1.
2. Dis-assemble Post Base Cover and install on post.
As shown in Fig. 2.
3. Pressed Dome Caps & Ball Caps are press fit into place.
As shown in Fig. 3 & 4.
4. Use a broom or compressor to remove debris from railing
and deck surface.
Fig. 1
14
INSTALLATION
Fig. 2
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26

Publicité

Table des Matières
loading

Table des Matières