Fortress Building Products PURE VIEW Instructions D'installation page 34

Masquer les pouces Voir aussi pour PURE VIEW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. 6
Step 4:
Top Bracket Installation Continued (UB or CB)
1. Use Spring Punch to mark the holes. As shown in Fig. 1.
2. Drill out holes with a 3/16" drill bit. As shown in Fig. 2.
3. Use T-25 screws to attach the UB or CB base to the post.
Begin with top hole then bottom. As shown in Fig. 3.
4. Keep bracket base centered as you install second screw.
5. Insert barrel & screw to re-assemble bracket.
6. Tighten barrel & screw. As shown in Fig. 4 & 5.
7. Use T-25 screws to attach UB Bracket to UB Adapter.
As shown in Fig. 6.
Fig. 1
Fig. 3
34
PURE VIEW: Fe
GLASS BALUSTER INSTALLATION
26
Fig. 2
Fig. 4
UB-05 Stair
Bracket

Publicité

Table des Matières
loading

Table des Matières