Air Discharge Chamber For Top Discharge; Installing The Unit In Heavy Snow Areas; Precautions For Installation In Heavy Snow Areas; Dimensions Of Snow / Wind-Proof Ducting And Refrigerant Tubing Space For Installation - Panasonic U-200PE1E8 Instructions D'installation

Masquer les pouces Voir aussi pour U-200PE1E8:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 25
Big̲PAC̲eng.indb 7
(2) Obstructions on the front side and rear side (Left side, right
side and above the unit are opened). (Fig. 2-3)
* For compressor replacement, 50 cm or more is required on the
front side even when using the air discharge chamber.
(3) Obstructions on the front side and above the unit (Left side,
right side and rear side are opened). (Fig. 2-4)
30 cm
or more
In case of multiple installations
● Provide a solid base (concrete block, 10 × 40 cm beams or
equal), a minimum of 15 cm above ground level to reduce
humidity and protect the unit against possible water damage
and decreased service life. (Fig. 2-5)
● Use lug bolts or equal to bolt down unit, reducing vibration
and noise.
Air intake
Air intake
Air discharge
Air discharge
Anchor bolts
(4 pieces)
Min. 15 cm
or more

2-2. Air Discharge Chamber for Top Discharge

Be sure to install the air discharge chamber in the field when:
● it is difficult to keep a space of min. 1 m between the air
discharge outlet and an obstacle.
● the air discharge outlet is facing a sidewalk and discharged
hot air annoys passers-by. (Fig. 2-6)
Air discharge
Fig. 2-3

2-3. Installing the Unit in Heavy Snow Areas

In locations with strong wind, snow-proof ducting should
likewise be fitted and direct exposure to the wind should be
avoided as much as possible.
■ Countermeasures against snow and wind
In regions with snow and strong wind, the following problems
may occur when the outdoor unit is not provided with a platform
and snow-proof ducting (Fig. 2-7):
a) The outdoor fan may not run and damage of the unit may be
caused.
b) There may be no airflow.
c) The tubing may freeze and burst.
d) The condenser pressure may drop because of strong wind,
and the indoor unit may freeze.
Fig. 2-4
Without snow-
With snow-proof
proof ducting
ducting
(Low platform)
(High platform)
In regions with significant snowfall, the outdoor unit should
be provided with a platform and snow-proof duct.
2-4. Precautions for Installation in Heavy Snow
Areas
(1) The platform should be higher than the max. snow depth.
Fig. 2-5
(Fig. 2-7)
(2) The 2 anchoring feet of the outdoor unit should be used for
the platform, and the platform should be installed beneath
the air intake side of outdoor unit.
(3) The platform foundation must be firm and the unit must be
secured with anchor bolts.
(4) In case of installation on a roof subject to strong wind,
countermeasures must be taken to prevent the unit from
being blown over.
9
2011/02/23 13:37:46
Big̲PAC̲eng.indb 8
2-5. Dimensions of Snow / Wind-proof Ducting and
Refrigerant Tubing Space for Installation
166
Min. 100
Outdoor
Unit
Fig. 2-6
Duct
Duct
Air intake
About 1/2 of the unit height
It is recommended that space be provided (600 × 600 mm) for checking and servicing the electrical system.
Fig. 3-2 shows the detailed dimensions of the indoor unit.
479
300
41
100
100 50
23
178
2
Fig. 2-7
100 100
60
320
43

3. HOW TO INSTALL THE INDOOR UNIT

■ High Static Pressure Ducted Type (E1 Type)

3-1. Required Minimum Space for Installation and
Service (8, 10 Types)
Min. 100
The installation instructions that come with the indoor unit
Duct
308
describe how to use it in combination with the U-200PE1E8 and
U-250PE1E8 outdoor units.
Outdoor Unit
Please refer to the following when using it in combination
with the U-200PE1E8 and U-250PE1E8 outdoor units.
This air conditioner is usually installed above the ceiling so
that the indoor unit and ducts are not visible. Only the air
intake and air outlet ports are visible from below.
Unit: mm
The minimum space for installation and service is shown in
Fig. 3-1.
Min. 600
(Space for
service)
Air suction
side
Higher than the maximum
snow depth
Min. 700
(Space for
service)
Air intake
Platform (foundation)
Min. 610
Fig. 2-8
Min. 130
1
Refrigerant tubing joint (liquid tube ø12.7 mm) (Flare nut)
2
Refrigerant tubing joint (gas tube ø25.4 mm) (Brazing)
3
Power supply outlet
4
Drain port (O.D. 32 mm)
5
Duct connection for suction
Duct connection for discharge
6
1310
1070
10 100P=1000
106
44
28-ø3.5 (Holes all around)
26-ø3.5 (Holes all around)
4 - 37 12
9 100P=900
(Hole for suspension bolt)
964
67
1200 (Suspension bolt pitch)
67
1310
42
364
(236)
364
1334
1428
10
2011/02/23 13:37:47
1170
(Suspension bolt pitch)
1100
Inspection
Electrical
access
component box
Refrigerant
(600 600)
tubing
Drain pan
Ceiling face
Drain port
Unit: mm
Fig. 3-1
Unit: mm
Fig. 3-2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

U-250pe1e8

Table des Matières