Invacare MyOn Active Manuel De L'utilisateur page 92

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7 WHEELCHAIR OPERATION
The footplate will be on the inside of the wheelchair when locked in place.
4.
Repeat this procedure for the other front rigging assembly.
Removing
1.
Flip up both footplates (D).
2.
Push in release lever (E).
3.
Rotate front rigging (A) toward inside of wheelchair.
4.
Lift front riggng up and off of wheelchair frame.
5.
Repeat this procedure for the other front rigging assembly.
B
C
A
Invacare® MyOn
FIGURE 13
Installing/Removing Front Riggings - MyOn JR
E
92
D
Part No 1167417

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

MyonMyon jr

Table des Matières