Commissioning And Operation; Making Settings; Assigning The Valve Supply - Aventics EtherNet/IP Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 79
58
AVENTICS | EtherNet/IP™ | R412012728–BDL–001–AC

Commissioning and Operation

A
B
7
Commissioning and Operation

7.1 Making settings

The following presettings have to be made:

Assigning the valve supply

7.1.1
Assigning the valve supply
The S4, S5, and S6 switches for assigning the valve supply are located beneath PG
fitting B (see fig. 6). The following is assigned to each switch:
4 double subbases for double solenoid valves (with solenoids 12 and 14) or
8 double subbases for single solenoid valves (with solenoid 14).
S6
S5
S4
Fig. 6:
S4, S5, S6 switches for assigning valve supply voltages (U
This switch allows valves to be assigned in groups to supply voltages U
When delivered, all valves are assigned to the U
Table 14:
Assignment of the S4, S5, and S6 switches
Double subbases for double
Switches
Byte
S4
0
S5
1
S6
2, 3
Voltage at switches
Switches can be damaged if voltage is applied to them during operation.
Always operate switches in a voltage-free state!
U
U
Q2
Q1
solenoid valves
(solenoids 12, 14)
1 – 4
5 – 8
9 – 16
NOTICE
, U
Q1
Q1
voltage.
Q1
Double subbases for single
solenoid valves
(solenoid 14)
1 – 8
9 – 16
17 – 32
)
Q2
and U
.
Q2