table of contents
EN
general information
1.0
1.1
rates and efficiencies
1.2
installation checklist
1.3
installation overview
1.4
rating plate/lighting instruction
location
1.5
mobile home installation
1.6
hardware list
1.7
lifting handles installation/removal 11
2.0
dimensions
2.1
single-sided
2.2
see-through
3.0
minimum venting requirements 14
3.1
typical venting installation
3.2
minimum air terminal location
clearances
3.3
horizontal termination (natural gas) 19
3.4
vertical termination (natural gas)
3.5
horizontal termination (propane )
3.6
vertical termination (propane)
4.0
rough framing - before appliance
installation
4.1
minimum framing dimensions
4.1.1 minimum clearance to combustible
enclosures
4.2
front frame installation
5.0
venting installation
5.1
firestop spacer assembly
5.2
horizontal installation
5.3
vertical installation
5.4
using flexible vent components
5.4.1 horizontal air terminal installation
5.4.2 vertical air terminal installation
5.4.3 appliance vent connection
5.5
restricting vertical vents
5.5.1 TLV50L / TLV50L2
5.5.2 TLV62L / TLV26L2 / TLV74L /
TLV74L2
5.6
vent shield installation
6.0
electrical information
6.1
hard wiring connection
6.2
receptacle wiring diagram
6.3
in the event of a power failure
6.4
battery holder/switch installation
6.5
initializing the battery holder/switch
for the first time
6.6
access panel
6.7
wiring diagram
6.8
eFIRE application controller
6.8.1 TLV50L / TLV50L2 wiring diagram 43
6.8.2 TLV62L / TLV62L2 / TLV74L /
TLV74L2 wiring diagram
note:
The information throughout this manual is believed to be correct at the time of printing. Wolf Steel Ltd. reserves
the right to change or modify any information within this manual at any time without notice. Changes, other than
editorial are denoted by a vertical line in the margin.
4
W415-4127 / B-0 / 03.25.24
5
7.0
gas installation
6
8.0
operation
7
8.1
pilot-on-demand
8
9.0
nailing tab installation
10
10.0
finish framing - after appliance
11
installation
11
10.1
framing with non-combustibles
12
11.0
finishing
12
11.1
fastener placement restriction
13
11.2
finishing with non-combustibles
11.3
installing non-combustible board
11.4
minimum combustible mantel
16
clearances
11.5
TV mounting restrictions
18
(without DHC™)
11.6
safety barrier installation / removal 58
22
11.7
firebox glass door installation /
23
removal
26
11.8
media installation / removal
11.9
media tray removal
27
11.10
adjusting the finishing trim
11.11
log installation
28
12.0
adjustments
29
12.1
restricting vertical vents
32
12.2
venturi adjustment
12.3
pilot burner adjustment
32
12.4
flame characteristics
33
13.0
maintenance
34
35
13.1
annual maintenance
36
13.2
control access
13.3
burner removal
36
13.4
valve removal
37
13.5
control module removal
37
13.6
LED replacement
38
13.7
night light replacement
38
13.8
glass / door replacement
13.9
care of glass
13.10
care of plated parts
38
14.0
replacement parts
39
40
14.1
overview
14.2
burner components
40
14.3
driftwood logs
40
14.4
oak logs
40
14.5
conversion kits
41
15.0
troubleshooting
41
16.0
warranty
42
42
42
44
45
46
47
48
49
49
52
52
53
55
56
57
58
60
61
61
62
63
63
63
64
64
65
66
66
67
68
68
69
70
71
71
71
72
73
74
76
77
77
78
81