Télécharger Imprimer la page

Christopeit Sport SP2000 Instructions De Montage Et D'utilisation page 21

Publicité

Les langues disponibles
  • FR

Les langues disponibles

STEP 11
Connect the curl bar (12) at cable 2 (39)
1. Connect the curl bar (12) at cable 2 (39) by using the long
chain (45) and carbine hooks (3).
Using of carbine hooks
a. Loose the screw nut of C-hook(3) and put the chain (45/46)
into the C-hook(3).
b.Put the cables' end (39+40) or pull bars (12+15) into the
C-hook (3).
c. Screw the nut of carbine hook (3) tightly and ensure that it
is closed.
Attention! Before start exercising ensures that the 5 carbine
hooks (3) are closed tightly.
STEP 12
Installation of weight cover (16).
1. Insert the weight cover holder (28) into ends of weight
covers (16). Place the weight cover (16) to top and bottom
cover bracket (22+82) and x each weight cover end with ca-
ble ties (61).
2. Use the buttery nut (33) to adjust the tightness o cover
(16) so that the weight don't touch the cover during Lift up
and down. Turn clockwise to tighten and turn anticlockwise for
loosen the weight cover.
3. Attach the product label (108) to the top cover bracket (82)
with 2 wire ties (61).
CHECKS
1. Check the correct installation and function of all screwed
and plug connections. Installation is thereby complete.
2. Before starting training, ensure that the recommended
safety clearances are maintained to other objects.
3. When using the machine, always be sure to wear suitable
headwear and clothes. This must protect against catching hair
or clothing and trapping hair or clothing in the moving parts of
the machine.
4. When everything is in order, familiarise yourself with the
machine with light weights. The weights have to secure with
security pin (30). Maximum load of weight: 56Kg.
Note: Depends on exercising you can use latissimus bar (15)
instead of curl bar (12) at both cable connections points.
a
b
c
12
3
108
61
16
21
3
4
39
45
33
82
28
22
GB

Publicité

loading