Ecolab DG1-III-DLA-PCB Manuel D'utilisation page 114

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Maintenance
Interval
Annually (depending on the
degree of pollution and the
water quality)
MAN049250 Rev. 1-01.2021
Maintenance work
Electrical cables, mains transformer:
Check all electrical lines for damage
n
(especially the transformer)
n
Exchange in case of damage.
Electr. Components are subject to regular
inspection in accordance with DGUV V3.
The inspection intervals (max. 4 years) are
determined by the operator according to a
risk assessment.
Concentration setting:
n
Checking the concentration see
Ä Chapter 7.5 'Checking the Concentration'
on page 35.
Flow monitor, function test, tightness of the
pressure maintenance valve:
n
Loosen the flow monitor from the screw
connection: If disinfectant escapes, the flow
monitor must be replaced.
Dosing pump leak test:
n
Look for any leakage of concentrate on the
piston rod with the device switched on.
If product leaks: Replace O-rings on piston/
piston rod, replace metering pump if
necessary.
System separation:
n
Check the free path for soiling and
directional jet discharge.
n
Clean the jet regulator and replace it if
necessary.
n
Check the pipe interrupter DB for leaks.
n
Replace rubber membrane or pipe
interrupter.
Swivel spout:
n
Dismantle the swivel spout.
n
Press the pipe wall firmly with your fingers
after the first 90° bend on the outlet side.
n
If dented = material wear.
n
Replace the swivel spout.
Suction lance (function test / leak test):
n
Immerse beaker with disinfectant up to below
the electrodes of the suction lance; if the
dosing pump sucks in air, the hose in the
suction lance is defective.
Replace suction lance or hose.
n
42
Personnel
Qualified
electrician
Operator
Service
personnel
Service
personnel
Service
personnel
Service
personnel
Service
personnel
Service
personnel

Publicité

Table des Matières
loading

Produits Connexes pour Ecolab DG1-III-DLA-PCB

Table des Matières