Ecolab DG1-III-DLA-PCB Manuel D'utilisation page 113

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Maintenance table
Interval
After downtimes (holidays, non-
operation, work on water supply
piping system, etc.) or every
5-10 years (depending on water
quality) or immediately in case
of microbial contamination by
the drinking water.
Maintenance work
Internal maintenance of the device:
n
Clean the bottom of the appliance.
n
Remove limescale residues.
Exterior maintenance of the device:
n
Clean the bonnet with a damp cloth.
Dry rub
n
n
Then treat with stainless steel care product.
Console:
n
Clean the canister.
n
Clean the stand surface.
Complete pipe system
n
Carry out maintenance according to
specification "Microbiological check"
Ä Chapter 10.1 'Specifications for
(see
microbiological testing of decentralised
disinfectant dispensers' on page 44).
n
Replacement of the piping system.
41
Maintenance
Personnel
Operator
Service
personnel
Operator
Service
personnel
Operator
Service
personnel
Mechanic
MAN049250 Rev. 1-01.2021

Publicité

Table des Matières
loading

Produits Connexes pour Ecolab DG1-III-DLA-PCB

Table des Matières