Operation; Device Commissioning / Product Changeover - Ecolab DG1-III-DLA-PCB Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operation

8
Operation
Personnel:
WARNING!
The unit is used exclusively for dosing validated chemicals.
The use of non-validated products can lead to malfunctions, incorrect
dosing, leakage, etc. and thus possibly to health risks!
DANGER!
Increased risk of slipping
Increased slip hazards can occur due to:
– Dripping of working solution from the swivel spout.
– Use of non-Ecolab-approved (validated) products poses the risk of foam
formation due to overflow.
– Changing the product canister.
Operator panel
2
8.1

Device commissioning / product changeover

Sequence steps for commissioning the unit or changing to another product:
1.
Insert a filled product canister on the console and swing in the suction lance.
2.
Setting the desired concentration.
3.
Venting water and product line.
4.
Separate withdrawal of water and disinfectant and collection in measuring gauges.
To do this, unscrew the flow monitor from the mixing valve.
5.
Determination / calibration of the actual concentration in accordance with
Ä Chapter 7.4 'Calibration' on page 34.
6.
Attach documentation of the set concentration and the assigned product in a
suitable, clearly visible place in the immediate vicinity of the unit.
MAN049250 Rev. 1-01.2021
n
Operator
n
Specialist
1
3
4
5
36
1
Manufacturer
2
Device type
3
'Start' key
4
LED
(off: offline, green: operation, red: error)
5
'Stop (pause) key' key

Publicité

Table des Matières
loading

Produits Connexes pour Ecolab DG1-III-DLA-PCB

Table des Matières