Télécharger Imprimer la page

Kohler K-1913 Guide D'installation page 30

Masquer les pouces Voir aussi pour K-1913:

Publicité

Les langues disponibles

Les langues disponibles

Confirm Operation and Check for Leaks (cont.)
Raise the door. Make sure the drain valve closes and the door inflates when the door latches.
IMPORTANT! Both limit switches must make contact for the seal to inflate. Do not over adjust.
Adjust the limit switch to make steady contact with the latch pin if needed. Consult the "Adjust the
Limit Switch" portion of the "Adjust the Bath Door" section for illustrations and instructions.
Close the footwell floor drain and fill the bath with water to the overflow.
Check for leaks. Pay particular attention to the area around the door. There should be no indication
of leaking if no splashing or water movement is present.
If leaking is observed, drain the bath and clean any debris off the seal. Test for leaks again.
If leaking is still observed, adjust the door inward using the slots in the roller assembly.
Test again and continue these steps or consult the "Troubleshooting Procedures" section included in
this document.
Press the door switch and confirm that the drain valve opens. Open the footwell drain.
When the water level falls below the level sensors in the footwell, confirm the seal has deflated.
Squeeze the door handle and lower the door.
1128532-2-C
30
Kohler Co.

Publicité

loading