Télécharger Imprimer la page

Kohler K-1913 Guide D'installation page 26

Masquer les pouces Voir aussi pour K-1913:

Publicité

Les langues disponibles

Les langues disponibles

Water Inlet
Nut
and O-Ring
Drain Valve
15. Connect the Components
All Installations
NOTE: Depending upon disassembly, some of these components may still be connected.
Confirm the O-ring is in place and connect the water inlet to the drain valve by tightening the nut.
If an Uninterruptible Power Supply (UPS) has been installed, connect the power following the
directions supplied with the UPS
Connect the drain valve power at the controller, J2.
Connect the level sensing wires at the controller, J3.
Connect the limit switches at the controller, J4.
NOTE: Port J5 should remain unused.
Connect the door power at the controller, J6 and J7.
1128532-2-C
Connect to controller, J2.
Attach the drain.
Connect the drain valve power.
Connect level sensing wires.
Connect limit switch wires.
Connect door power.
26
Open
Controller
J1
J2
J3
J4
J5
J6
and
J7
Kohler Co.

Publicité

loading