Installation Of The Version With Double Filter For Air Renewal; Desiccant Bag; Accessories; Heater - Videotec HEG Manuel D'instructions

Masquer les pouces Voir aussi pour HEG:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24
6.5 Installation of the version
with double filter for air renewal
During installation pay attention to the
orientation of the air inlet filter fins.
OUT
Fig. 4
To guarantee weatherproof protection, install the
housing on the support following the inclination
limits as shown in the picture.
Depending on the angle of inclination of the
housing, the orientation of the filter fins must
prevent water penetrating in case of rain:
Fig. 5
Maximum tilt of the transversal axis: 0°.
Maximum tilt of the longitudinal axis: ±45°.

6.6 Desiccant bag

Take the dessicant salt bag out of its pack and insert
it into the product.
MNVCHEG_2222_EN

7 Accessories

For further details on configuration and
use, refer to the relative manual.

7.1 Heater

7.1.1 Heater installation

At the end of istallation, connect the wiring to the
terminal (heater power supply, 6.3 Board description,
page 6).

7.2 Camera power supply

7.2.1 Camera power supply installation

Pay attention to the voltage used to power
the circuit. Depending on requirements
use the correct power supply kit.
Usable power supplies:
• IN from 100Vac up to 240Vac, 50/60Hz - OUT
12Vdc, 1.25A
• IN 230Vac, 50Hz - OUT 24Vac, 50Hz, 400mA
Fig. 6
Camera power supply.
After installation, connect the power supply to
the connector (power supply connector, 6.3 Board
description, page 6).
7

Publicité

Table des Matières
loading

Table des Matières