INSTALLATION
A. ZP1057MTK Back/Ceiling Mount
1.
For back mount, use the bracket as a template, mark and drill holes into
the mounting surface and use supplied 5/16" bolts (see Figure 3).
2.
Fixture is now ready for mounting.
3.
It is strongly suggested to use two (2) qualified tradespeople to proceed
with the final mounting of the fixture. This is recommended to avoid any
personal injury or damage to the fixture.
4.
Place the four (4) 5/16" bolts through the mounting plate and tighten
evenly to the support structure. Minimum torque 138 in.-lbs. (15.6 N-m).
5.
Make sure the power is disconnected from the conduit system before
installing the fixture.
6.
Slide the fixture into the mount bracket, engaging the flange on the top of
the fixture and position it near the center. For final positioning, adjust to
dimension B in the table below.
7 .
Tighten the four (4) 1/4" set screws on the slide bracket until they bottom.
Torque to 78 in.-lbs. (8.8 N-m).
Note: If installing linear luminaires vertically on a wall, ensure the drivers are
positioned closest to the ground (down, instead of up) to avoid unnecessary
heat rising into the driver housing.
8.
2 Foot
2 Foot
4 Foot
Length
(in)
(mm)
(in)
A
27 .0
685
44.6
B
7 .5
190
16.3
12.7
.50 MAX
147.6
5.81
165.1
6.50
50.8
112.3
304.8
2.00
4.42
12.00
283
11.14
A
Figure 3. ZP1057MTK Back Mount Installation
B. ZP1050MTK Swivel Mount
1.
Make sure the power is disconnected from the conduit system before
installing the fixture.
2.
Mark and drill holes for fastening swivel brackets. Use two (2) 3/8" bolts
(not supplied) at center to center measurements. For swivel brackets,
holes may be spaced as required. For the four foot, it is required to
keep them at least 18" (457mm) apart (see Figure 4) (see table for full
mounting range).
3.
Fixture is now ready for mounting. It is strongly suggested to use two (2)
qualified tradespeople to proceed with the final mounting of the fixture.
This is recommended to avoid any personal injury or damage to the
fixture.
4.
Slide the fixture into the mount brackets, engaging the flange on the top
of the fixture and position it near the center.
!
Do not let the fixture hang or flex on one bracket at a time. Failing to
comply will result in breakage of bracket and possible injury or death.
5.
Tighten the two (2) 1/4" set screws on each slide bracket until they
bottom (see Figure 5). Torque to 78 in.-lbs. (8.8 N-m).
6.
Adjust the position of the fixture to the desired angle and tighten the two
(2) 5/16" pivot bolts. Torque to 138 in.-lbs. (15.6 N-m).
7 .
Tighten the two (2) 1/4" pivot locking nuts at the adjustment slots to 78
in.-lbs. (8.8 N-m).
IF 1910 • 03/21
4 Foot
(mm)
1133
414
A
283
11.14
50.8
2.00
5/16-18 BOLT
B
1/4" Set Screws
WARNING
Copyright © 2021, Eaton's Crouse-Hinds Division
2 Foot
Length
(in)
A
27 .0
B
12-29
165.1
6.50
73
2.88
14.6
2X
.58
B
4X
C. PM KIT – POLE MOUNT
1.
Make sure the power is disconnected from the conduit system before
installing the fixture.
2.
Verify that the clamp (see Figure 7) internal diameter is consistent with
the diameter of the pole prior to installation. Clamps are available in 1.65"
(42mm), 2.00" (51mm) and 2.36" (60mm) sizes.
3.
Pole mount brackets may be spaced as required; for the four foot, it is
required to keep them at least 18" (457mm) apart (see Figure 6) (see
table for full mounting range).
4.
Slide the two (2) pole mount brackets onto the fixture, engaging the
flange on the top of the fixture.
5.
Tighten the two (2) 1/4" set screws on each slide bracket until they
bottom (see Figure 7). Torque to 78 in.-lbs. (8.8 N-m).
6.
Remove the two (2) 5/16" screws, lock washers and nuts on each clamp
and remove the upper clamp halves.
7 .
Fixture is now ready for mounting. It is strongly suggested to use two (2)
qualified tradespeople to proceed with the final mounting of the fixture.
This is recommended to avoid any personal injury or damage to the
fixture.
8.
Lift fixture into position such that the pole fits into the lower clamp halves.
9.
Install the two (2) upper clamp halves and the 5/16" screws, lock washers
and nuts on each clamp.
10. Tighten the nuts on the 5/16" screws evenly using a back and forth
sequence. Torque to 138 in.-lbs. (15.6 N-m).
2 Foot
4 Foot
4 Foot
(mm)
(in)
(mm)
685
44.6
1133
222-750
18-47
222-1194
190.1
7.49
A
B
Figure 4. ZP1050MTK Swivel Mount Installation
Pivot Bolt