Replace The Blade; Lubrication - GreenWorks Pro CRZ426 Guide D'assemblage

Masquer les pouces Voir aussi pour CRZ426:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

14.1.1 REPLACE THE BLADE

1. Stop the motor, remove the start key, and set the parking
brake.
2. Raise the height of the cutting deck to its highest position
to allow access to blades.
If necessary, raise the mower by placing on a lift or
using a jack and jack stands, or remove the cutting deck
as described in the previous section to gain access to the
blades.
WARNING
If raising the mower to access the blades, make sure the
mower is properly secured and the parking brake is set
before proceeding. Failure to properly secure the mower
could cause it to fall, resulting in death or possible
serious personal injury.
3. Wedge a block of wood between the blade and mower
deck to prevent the blade from turning.
4. Loosen the blade nut by turning it counterclockwise (as
viewed from bottom of mower) using a 16 mm wrench or
socket (not provided).
5. Remove the blade nut, spacer, blade insulator, and blade.
6. Thread the blade nut on the shaft and finger tighten.
7. Torque the blade nut down clockwise using a torque
wrench (not provided) to ensure the bolt is properly
tightened. The recommended torque for the blade nut is
796~885 in. lbs.
WARNING
Ensure blade is properly seated and the blade nut is
tightened to the torque specifications above. Failure to
properly attach the blade could cause it to come loose
and result in possible serious personal injury.
8. Repeat with second blade, if needed.
Make certain all parts are replaced in the exact order in
which they were removed.
Washer
Blade
Bolt
NOTE
NOTE
English
14.2
TIRES
It is important for level mowing that all tires have the correct
amount of air pressure. The recommended pressure are:
Tire pressure should only be measured or adjusted when
tires are cold.
Front caster wheels
Drive wheels
Inspect the tires daily. Replace immediately if damaged.
Check the tire pressure carefully while inflating. Too much
air in the tire could cause the tire to burst, causing serious
personal injury.
14.3

LUBRICATION

Please add oil before operation.
Oil type
Oil capacity
Contact your Greenworks dealer to replace the lubrication.
Replace the gearbox oil after you operate the machine for
50 hours for the first time, then replace the oil every 200
hours.
Oil drain outlet
29
NOTE
37 psi
8 psi
NOTE
WARNING
SAE85W-140
180 ml
NOTE
Oil ruler
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Crz428

Table des Matières