Installation Examples - Homa Sanistar C Manuel D'instructions Original

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation examples

Direct connection toilet
(Inlet height 250 mm)
The system must be installed so that the operating and serviceable items are easily accessible. Be sure to allow sufficient free space (approx.
50 cm) between the lateral inlet and existing walls.
Tighten all clamps connecting the elastic transition pieces to the piping and the tank to 20Nm.
Install a shut-off valve in the inlet and pressure line in order to facilitate the work steps during maintenance or possible dismantling of the
system.
To avoid deposits in the horizontal pressure line, the line and the system must be designed for a minimum flow rate of 0.7 m/s and at least 1.0
m/s for vertical lines.
The inlet can take place through the horizontal or vertical inlet pipe For the desired connection, the corresponding opening must be cut off of the
respective inlet pipe of the container. The internal diameter of the inlet line and inlet pipe must be coordinated.
The discharge line should not be laid in tight bends. The line must be laid above the backflow level, i.e. it must be laid in a continuous rise above
this level, and must then feed directly to the manifold in a loop.
A gate valve should be installed immediately after the integrated non-return flap in the discharge line.
In order for the level control unit to function properly, it is essential to lay the pressure hose between the storage tank and control unit without
bends and at a steadily rising level, without loops.
Cut open the vent pipes and install a DN 70 vent line on the storage tank using the supplied elastic transition piece. line must lead outside in
accordance with local regulations.
The supplied/connected switchgear must be attached to the wall and be secured against flooding in accordance with local regulations.
We recommend the installation of a manual diaphragm pump in order to be able to empty the storage tank in the event of a power or pump fail-
ure. To do so, drill open the 1" connection located on the container. Install the manual diaphragm pump into a 1" rising line (use a pipe or hose).
A non-return flap should be installed in the line to above the manual diaphragm pump to prevent the return flow of the medium to be pumped.
Guide the rising line to the manifold over the backflow level.
Main inlet vertical
Sewer backflush level
Free standing toilet
(Inlet height 180 mm)
ENGLISH | 21

Publicité

Table des Matières
loading

Table des Matières