Complete The Installation - Kohler K-1845 Guide D'installation

Barre d'appui
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Apply color-matched
silicone sealant.
End Cap
Grip Rail

10. Complete the Installation

Complete the finished wall.
Apply color-matched silicone sealant to the seam between the hand rail and the tile. Do not use
grout for this seam.
Allow the silicone sealant to dry following the sealant manufacturer's directions.
Kohler Co.
13
Apply color-matched
silicone sealant.
1091559-2-B

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-1846

Table des Matières