Kohler K-1845 Guide D'installation page 12

Barre d'appui
Masquer les pouces Voir aussi pour K-1845:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Apply color-matched
siliconized sealant.
3/4"
(1.9 cm)
Tile flush
with front
edge of the
grip rail.
Tile
9. Install Tile in the Grip Rail
NOTE: The bottom edge of the grip rail is slightly thinner than the top edge. The tile should be flush with
the top edge and extend slightly beyond the bottom edge of the grip rail.
Determine how thick of a mortar or adhesive bed will be needed by subtracting the tile thickness
from 3/4" (1.9 cm).
3/4" (1.9 cm) - Tile Thickness = Mortar/Adhesive thickness.
If mortar or adhesive is unable to provide a thick enough underlayment, use a piece of wall
material (cement board) as a shim.
Apply the adhesive or mortar to the grip rail in the correct thickness.
Apply the tile to the grip rail. Confirm that the front face of the tile is flush with the top front edge
of the grip rail.
Apply color matched silicone sealant to the seams around the tile.
1091559-2-B
Grip Rail
Cement Board Shim
Mortar
1/8" (3 mm)
12
Cement Board
Kohler Co.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-1846

Table des Matières