dorma ED 200 Instructions De Montage page 6

Table des Matières

Publicité

DORMA
Recycling and disposal
Both the
of recyclable raw material.
The
ED 200
must not be disposed of as domestic waste.
Please ensure that the old appliance and the
respective accessories (if available) are properly
disposed of.
Please abide by the prevailing national statutory provisions.
Safety during mounting
The working area has to be secured against
unauthorised access from other people. Falling items
or tools might cause injuries.
The
ED 200
liquids.
In any case, the way of mounting and the mounting
equipment, like for example screws and wall plugs,
have to be adequate with regard to the structural
conditions (steel structure, wood, concrete etc.).
Before installing the
checked with respect to proper mechanical condition
and smooth running.
The mounting of the
an example. Structural or local conditions, available
tools or other conditions might suggest a different
approach.
Following the successful installation of the system, the
settings and the proper function of the
the safety equipment have to be checked.
Only specially qualified staff may open the power
supply housing.
Disconnect the
energise the system) before removing the cover of the
power supply housing. Remove mains plug or switch
off fuse (with permanent power supply).
Always pull at the plug and never at the cable when
unplugging the power supply.
Safety during commissioning
The protective earth conductor has to be connected.
The safety sensors are to be connected (see
commissioning instructions)..
Separately supplied components such as the program
switch, the EMERGENCY OFF pushbutton and
activators (radar motion detectors, NIGHT-/BANK key
switches) have to be mounted and connected.
Ensure that the door leaves run smoothly
The operator and the door leaf must be properly
linked.
Inspection and system approval
Before the first commissioning and depending on
requirements, however, at least once a year, the
to be inspected by a properly qualified technician and
serviced if required.
A person trained by DORMA has to perform the inspection
and approve the system with the aid of the inspection book.
The respective results have to be documented in accordance
with DIN 18650-2 and the facility operator has to keep
these documents for at least one year.
We would recommend taking out a maintenance agreement
with DORMA.
Briefing:
Following the adjustment, commissioning and functional
testing of the door system, the operating instructions have
to be handed over to the facility operator and a briefing has
to be made.
6
ED 200
194 605-01-6-50
ED 200
and its packing mainly consist
and the respective accessories
has to be secured against water and other
ED 200
the door leaf has to be
ED 200
described herein is only
ED 200
ED 200
from power supply (de-
Maintenance
The system has to be de-energised (disconnected from
power supply) before performing any kind of maintenance
work. Remove the power plug or switch off the fuse (with
permanent power supply).
Please consider the leaflet regarding the application of hold-
open devices for further information and instructions
regarding the application of the
doors.
We would recommend taking out a maintenance agreement
with
DORMA.
Care
The system has to be de-energised (disconnected from
power supply) before cleaning the system. Remove the
power plug or switch off the fuse (with permanent power
supply).
You may clean the
commercial detergents.
You should not use scouring agents for cleaning purposes as
they might damage the surface finish.
Ensure that no water or other liquids drop on or into the
ED 200.
Never stick metal objects into the openings of the
otherwise you might sustain an electric shock.
Wear
The slide piece has to be inspected at regular intervals
(every year) and replaced if required.
Only use original spare parts.
and
ED 200
has
ED 200
at fire and smoke
ED 200
with a damp cloth and standard
ED 200

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières