Fitting The Device; Tools Required; Mounting Instructions - Dometic SINEPOWER DSP 1212C Instructions De Montage Et De Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 67
SinePower
4: 12-day conditioning
Every 12 days, the battery charger switches back to phase 3 for 85 min in order to
revive the battery. This prevents any fatigue symptoms such as sulphation.
8

Fitting the device

8.1

Tools required

For the electrical connection you will need the following tools:
• DC connection: two flexible connection cables
Determine the necessary thickness from the table in chapter "Fitting the device"
on page 15.
• AC connection: two 3-phase cables (input and output)
• Housing ground: one cable
• Crimping tool
• Cable lugs and conductor sleeves
For fastening you will require the following tools:
• Machine bolts (M4) with washers and self-locking nuts or
• self-tapping screws or wood screws.
8.2

Mounting instructions

When selecting the installation location, observe the following instructions:
• The device can be mounted horizontally or vertically.
• The device must be installed in a place that is protected from moisture.
• The device may not be installed in the presence of flammable materials.
• The device may not be installed in a dusty environment.
• The place of installation must be well ventilated. A ventilation system must be
available for installations in small, enclosed spaces. The minimum clearance
around the device must be at least 5 cm (fig. 4).
• The air intake on the underside or the air outlet on the back of the device must
remain clear.
EN
Fitting the device
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sinepower dsp 1224cSinepower dsp 2012cSinepower dsp 2024c

Table des Matières