Set-Up And Start-Up; Operating Elements; Start-Up - Fahl NEBUSTEAM Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.0 SET-UP AND START-UP

EN
3.1

OPERATING ELEMENTS

Mains connection cable
ON/OFF rotary switch
Figure 5
3.2

START-UP

The NEBUSTEAM
INHALER is delivered ready for
®
operation.
• Lift the device out of the packaging. Carry out a visual
inspection for external damage.
• Before each use, check the saftey cap of the steam
tank,
the inhalants-/condensate tank, the inhalation
masks, the cover, and all other optional components.
• Check whether the voltage values indicated on the
power rating plate agree with the voltage supplied.
• Always place the device on a level, secure surface.
• You must observe the safety instructions in Section 2.0
before starting up the device for the first time.
• Following transport at temperatures below freezing
point, the device must be left to stand at room tempe-
rature for up to six hours before start-up. If the device is
not acclimatised, it must not be operated.
• Only plug the NEBUSTEAM
socket.
• Do not place the NEBUSTEAM
blankets.
• Ventilation slits should not be obstructed.
36
INHALER into a 230 V wall
®
INHALER on cloths or
®

Publicité

Table des Matières
loading

Table des Matières