Set-Up And Start-Up; Operating Elements; Start-Up - Fahl NEBUFIRST Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.0 SET-UP AND START-UP

EN
3.1

OPERATING ELEMENTS

➏ On/Off button
➐ Mains connection cable
Figure 3
3.2
30

START-UP

The NEBUFIRST
INHALER is delivered ready for
®
operation.
Lift the device out of the packaging. Carry out a visual
inspection for external damage.
Check whether the voltage values indicated on the power
rating plate agree with the voltage supplied.
Always place the device on a level, secure surface.
You must observe the safety instructions in Section 2.0
before starting up the device for the first time.
Following transport at temperatures below freezing point,
the device must be left to stand at room temperature for up
to six hours before start-up. If the device is not acclimatised,
it must not be operated.
Only plug the NEBUFIRST
®
socket.
Do not place the NEBUFIRST
blankets.
Ventilation slits should not be obstructed.
INHALER into a 230 V wall
INHALER on cloths or
®

Publicité

Table des Matières
loading

Table des Matières