Vacuum Pumping; Leakage Detection - Gree INVERTER GEH09AA-K6DNA1F/I Manuel D'utilisateur

Masquer les pouces Voir aussi pour INVERTER GEH09AA-K6DNA1F/I:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Vacuum pumping

Use vacuum pump
1. Remove the valve caps on
the liquid valve and gas
valve and the nut of refri-
gerant charging vent.
2. Connect the charging hose
of piezometer to the refri-
gerant charging vent of gas
valve and then connect the
other charging hose to the
vacuum pump.
3. Open the piezometer com-
pletely and operate for
10-15min to check if the
pressure of piezometer re-
mains in -0.1MPa.
4. Close the vacuum pump
and maintain this status for
1-2min to check if the pres-
sure of piezometer remains
in -0.1MPa. If the pressure decreases, there may be leakage.
5. Remove the piezometer, open the valve core of liquid valve and gas valve
completely with inner hexagon spanner.
6. Tighten the screw caps of valves and refrigerant charging vent.
7. Reinstall the handle.

Leakage detection

1. With leakage detector:
Check if there is leakage with leakage detector.
2. With soap water:
If leakage detector is not available, please use soap water for leakage detection.
Apply soap water at the suspected position and keep the soap water for more
than 3min. If there are air bubbles coming out of this position, there's a leakage.
liquid valve
gas valve
refrigerant
charging vent
nut of refrigerant
charging vent
17
piezometer
valve cap
vacuum pump
inner hexagon
spanner
close
open
Lo
Hi

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Inverter geh12aa-k6dna1a/iInverter geh18aa-k6dna1f/i

Table des Matières