Start-Up Procedure; Normal Mode - LEGRAND DAKER DK Plus 5 kVA Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.3

Start-up procedure

4.3.1 Normal mode

1. Install all the cables and the terminal block cover according to the instructions on paragraph
3.5.
2. Check that the load breakers and the UPS utility input breaker and bypass input breaker (if pre-
sent) are in the "OFF" position.
3. Turn ON the power breaker of the distribution panel and the UPS breakers. The LEDs
show that the input and bypass line are present and the fans spin up. The display visualizes
fig. 1 followed by figure 2 if the pre-startup of the UPS is successful.
Fig. 1
Fig. 2
WARNING
When the UPS is in standby, the battery charger is active and the bypass line powers the loads.
4. Proceed to choose the desired UPS settings as described in paragraph 4.6.
5. Press
and hold it until the buzzer sounds twice. The display changes from fig. 2 to fig. 3.
DAKER DK Plus
5 kVA - 6 kVA - 10 kVA
and
55