LEGRAND DAKER DK Plus 5 kVA Manuel D'installation page 60

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Follow this procedure to change the buzzer setting:
- press
. The buzzer setting is displayed;
- press
to select ON or OFF;
- confirm the choice by pressing
The battery test can be performed to check the optimal operation of the batteries. The test can be
performed only after the batteries are fully charged, the input line is present and the UPS is pow-
ering the loads. Follow this procedure to perform the battery test:
- press
;
- press
to display the battery test setting;
- press
to select ON. The UPS transfers to stored energy mode for 10 seconds. During the test,
the loads are always powered with no voltage dip;
- if at the end of the test the UPS transfers back to normal mode without any alarm code, the bat-
teries are still working properly.
To change all the other settings, the UPS must be in standby mode. In this condition the loads are
powered. Therefore all the needed settings must be performed before turning on the external
output breaker.
Follow this procedure to change the UPS settings:
- press simultaneously
twice. The LCD displays the first setting ("buzzer");
- all the different settings can be scrolled pressing
- except for the buzzer and the battery test, all the other settings may be changed by pressing
;
- after changing settings, scroll to the "End" screen and then press
- the UPS restarts automatically. However, it is also suggested to remove the mains for at least 30
seconds.
60
.
and
for approximately three seconds, until the buzzer sounds
;
to save all changes;
4 Operation

Publicité

Chapitres

Table des Matières
loading

Table des Matières