Figure 1 Product overview
1 Controller connector
2 Temperature sensor
3 Protective earth ground
4 pH or ORP electrode
Product components
The panel is assembled at the factory with all the components attached and plumbed.
Installation
Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the
document.
Attach the panel to a wall
Attach the panel vertically to a wall or structure that is able to hold at minimum 15 kg (32 lb) of
downward force. Use a location where the flow meter and junction box are accessible. Refer to
Figure
2.
User-supplied hardware:
• Four bolts, 10 × 40 mm (7/16 × 1.5 in.)
5 Sample inlet
6 Flow chamber
7 Drain connector
8 Flow meter
C A U T I O N
English 5