Lenze 8200 motec E82MV551_4B Instructions De Montage page 96

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4
Mechanical installation
Wall mounting
EMC−compliant wiring
Conditions for trouble−free operation:
ƒ Except for the mains cable, use shielded cables only.
ƒ Carefully connect the shielding to PE.
ƒ Separate control and mains cables from motor cable!
ƒ Connect motor and mains PE conductors to separate PE terminals.
A
B
C
D
F
8200mot100
0
Mains cable L1, L2, L3, PE
1
PE connection for mains cable
2
Use shielded motor cable (use
low−capacitance motor cables)
3
EMC−cable gland for the motor cable
4
PE connection of motor cable
5
Shielded control cable
PES
HF−shield termination by large surface connection to PE
96
X1
Fig. 4−3
E
G
l
Shield connection:
1. Prepare the cable
X2
H
2. Pass cable through the
I
J
3. Screw eye together with
6
Shield connection of control cable (firmly
connect shield to shield sheet)
7
PE connection for terminal strip X2
8
Isolated terminal (e.g. star point for star
connected motor)
9
Function module
X1
Terminal strip mains connection
X2
Terminal strip motor connection
eye of the shield sheet
and bend the eye.
shield sheet. The shield
must be firmly
connected with the
shield sheet.
0.7 Nm
6 lb-in
PES
EDK82MV222 DE/EN/FR 11.0

Publicité

Table des Matières
loading

Table des Matières