Lenze 8200 motec E82MV551_4B Instructions De Montage page 100

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4
Mechanical installation
Motor mounting
EMC−compliant wiring
Conditions for trouble−free operation:
ƒ Except for the mains cable, use shielded cables only.
ƒ Carefully connect the shielding to PE.
ƒ Connect motor and mains PE conductors to separate PE terminals.
A
B
C
D
0
Mains cable L1, L2, L3, PE
1
PE connection for mains cable
2
PE connection for motor
3
Shielded control cable
4
Shield connection of control cable (firmly
connect shield to shield sheet)
PES
HF−shield termination by large surface connection to PE
100
X1
Fig. 4−6
E
l
X2
F
G
H
8200mot101
5
PE connection for terminal strip X2
6
Isolated terminal (e.g. star point for star
connected motor)
7
Function module
X1
Terminal strip mains connection
X2
Terminal strip motor connection
Shield connection:
1. Prepare the cable
2. Pass cable through
the eye of the shield
sheet and bend the
eye.
3. Screw eye together
with shield sheet.
The shield must be
firmly connected
with the shield sheet.
0.7 Nm
6 lb-in
PES
EDK82MV222 DE/EN/FR 11.0

Publicité

Table des Matières
loading

Table des Matières