Tecno-gaz Europa B EVO Mode D'emploi page 75

Autoclave
Masquer les pouces Voir aussi pour Europa B EVO:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 83
15.2 Connection of demineralizer system
Here are indicated the specific connection to the autoclave of the water supply hose and
the connection of the electric plug.
1. Turn off the autoclave if it is on (FIG.2–pos.
2. Close the faucet located above the demineralization system
3. Install the demineralizer as indicated in its manual;
4. Twist the male screw of the connection-hose carrier with Teflon or other component
which guarantees the sealing of water;
5. Screw the connection on the Demineralizer tap (FIG.1–pos.
6. Insert the hose exit of demineralizer to the connection-hose carrier already screwed to
the autoclave;
7. Insert the plug of demineralizer to the socket (FIG.1–pos.
autoclave
8. Open the faucet located above the demineralization system;
9. Control that there is no water loss;
10. Turn on the autoclave;
11. Run one or more sterilization cycles to control the functioning of the connection and
check above all for leaking
At the end of each day always close the faucet located above
demineralization system to prevent flooding
Connect of demineralizer only to preprogrammed autoclave
If the unit at the beginning of the cycle shows e250 then you have to fill the
clean water tankuntil the maximun is reached
For the connection of demineralization system to the autoclave tecno-gaz
NOTE
refer to indications in the manual.
17
)
2
)
ENGLISH
7
) on the back of the
the
33

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Europa b evo 20Europa b evo 242033s22033clsStga099

Table des Matières