Installing The Internal Batteries - Eaton Powerware 5125 Guide D'installation

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 5125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION

Installing the Internal Batteries

To install the battery trays into the UPS chassis:
1.
2.
3.
4.
5.
12
EATON Powerware
Locate the cartons labeled "Battery Tray" (IBM PN 39J4828).
Verify that the battery circuit breaker on the UPS rear panel is in the
OFF position (see Figure 13 on page 14).
Unscrew and set aside the battery retaining bracket (see Figure 10).
Battery Retaining Bracket
Figure 10. Battery Retaining Bracket
Slide the battery trays into the chassis (see Figure 11).
Figure 11. Installing the Battery Trays
Secure the battery trays to the chassis with the battery retaining
bracket and screws removed in Step 3.
®
5125 (9910-P65) UPS Installation Guide for IBM
®
S
Applications
164201638 Rev A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Powerware 9910-p65Powerware 39j4818Powerware 103003611-3991

Table des Matières