Eaton Powerware 5125 Guide D'installation page 28

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 5125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION
3.
4.
NOTE After UPS installation, ensure maximum battery runtime by configuring the UPS for
the correct number of EBMs (see "Configuration Mode" on page 28).
14
EATON Powerware
If additional EBMs are to be installed, plug the EBM cable of the
second cabinet into the battery connector on the first EBM. Repeat
for each additional EBM. Up to four EBMs may be connected to the
UPS.
Continue to the following section, "UPS Installation."
Battery Circuit
Breakers
Figure 13. Typical EBM Installation
®
5125 (9910-P65) UPS Installation Guide for IBM
Battery Circuit Breaker
®
S
Applications
164201638 Rev A
UPS Battery
Connector
EBM Cable
EBM Battery
Connectors

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Powerware 9910-p65Powerware 39j4818Powerware 103003611-3991

Table des Matières