Ups Startup And Shutdown; Starting The Ups - Eaton 9130 Guide D'installation

Pour applications ibm
Masquer les pouces Voir aussi pour 9130:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 61
OPERATION

UPS Startup and Shutdown

22
EATON 9130 (9910-E15/E16) UPS Installation Guide for IBM
To start up or shut down the UPS, see:
S
"Starting the UPS" on page 22
S
"Starting the UPS on Battery" on page 23
S
"UPS Shutdown" on page 23

Starting the UPS

To start the UPS:
1.
Verify that the UPS power cord is plugged in.
2.
Switch on utility power where the UPS is connected.
The UPS front panel display illuminates and shows a status of "UPS
initializing...".
3.
Verify that the UPS transfers to Standby mode ("UPS on standby").
4.
Press the
button on the UPS front panel for at least one second.
The UPS front panel display changes status to "UPS starting...".
5.
Check the UPS front panel display for active alarms or notices.
Resolve any active alarms before continuing. Refer to
"Troubleshooting" in the UPS user's guide.
If the
indicator is on, do not proceed until all alarms are clear.
Check the UPS status from the front panel to view the active
alarms. Correct the alarms and restart if necessary.
6.
Verify that the
UPS is operating normally and any loads are powered.
The UPS should be in Normal mode.
ESC
7.
Press the
button until the start screen appears.
indicator illuminates solid, indicating that the
S
®
Applications
164201783 Rev 2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

9910-e1544v6738103007458-39919910-e1644v6739103007459-3991

Table des Matières